Concrete Poured

CHICAGO, IL – Yesterday Berglund Construction poured concrete at the first level deck of the bell tower.  The weather turned too cold to pour concrete in other areas.  The second and third decks are prepped for the concrete pour once the weather warms.

The broken limestone lintel at the second level was removed and replacement will occur when the weather warms.  Due to cold weather, construction will hold until the temperatures rise above 40 degrees.